|
|
|
|
| LEADER |
01942cam a2200277 a 4500 |
| 001 |
1/43782 |
| 008 |
130905s2009 enka b 001 0 eng |
| 020 |
|
|
|a 9781420090345 (hardcover : alk. paper)
|
| 020 |
|
|
|a 1420090348 (hardcover : alk. paper)
|
| 035 |
|
|
|l 46711
|
| 040 |
|
|
|a DLC
|c DLC
|d GR-PeUP
|
| 082 |
0 |
0 |
|a 658.4΄013 SPR
|
| 100 |
1 |
|
|a Sproull, Bob.
|
| 245 |
1 |
4 |
|a The ultimate improvement cycle :
|b maximizing profits through the integration of lean, six sigma, and the theory of constraints /
|c Bob Sproull.
|
| 260 |
|
|
|a Boca Raton :
|b CRC Press,
|c c2009.
|
| 300 |
|
|
|a xxxviii, 250 σ. :
|b εικ. ;
|c 24 εκ.
|
| 500 |
|
|
|a "A Productivity Press book."
|
| 504 |
|
|
|a Περιέχει βιβλιογραφία και ευρετήριο.
|
| 505 |
0 |
|
|a The lean, six sigma, and theory of constraints (TOC) : improvement cycles -- Introducing the ultimate improvement cycle (UIC) -- The value stream, a scheduling system, and performance metrics -- Finding waste in the constraint -- Reducing variation and defects -- Exploiting the current constraint -- Reducing waste and variation in the current constraint -- Subordinating nonconstraints to the current constraint -- Line balancing and flow optimization -- Optimizing the constraint buffer and pulling in the nonconstraints -- Elevating the constraint and implementing protective controls -- Breaking the current constraint -- Sustaining the gains with protective controls -- System constraints and problems -- Establishing the environment for change.
|
| 650 |
|
4 |
|a Business logistics.
|
| 650 |
|
4 |
|a Production management.
|
| 650 |
|
4 |
|a Six sigma (Quality control standard).
|
| 650 |
|
4 |
|a Theory of constraints (Management)
|
| 852 |
|
|
|a INST
|b UNIPILB
|c MAIN
|e 20130905
|h 658.4΄013 SPR
|p 00169600
|q 00169600
|t LOAN
|y 4
|x 20140116
|4 1
|
| 856 |
4 |
|
|d /webopac/covers/03/46711_9781420090345.jpg
|z (hardcover : alk. paper)
|
| 856 |
4 |
|
|d /webopac/covers/03/46711_1420090348.jpg
|z (hardcover : alk. paper)
|