Implementing six sigma : smarter solutions using statistical methods /

* Includes new and expanded coverage of Six Sigma infrastructure building and benchmarking. * Provides plans, checklists, metrics, and pitfalls.

Κύριος συγγραφέας: Breyfogle, Forrest W., 1946-
Μορφή: Βιβλίο
Γλώσσα: English
Στοιχεία έκδοσης: Hoboken, NJ : Wiley, 2003.
Έκδοση: 2nd ed.
Ταξινομικός αριθμός: 658.562 BRE
Θέματα:
Ετικέτες: Προσθήκη ετικέτας
Δεν υπάρχουν, Καταχωρήστε ετικέτα πρώτοι!
LEADER 04989cam a22003614a 4500
001 1/52418
008 020911s2003 njua b 001 0 eng
010 |a  2002033192 
015 |a GBA3Z5326 
020 |a 0471265721  |q (cloth ;  |q acid-free paper) 
020 |a 9780471265726  |q (cloth ;  |q acid-free paper) 
035 |a (OCoLC)50606471  |z (OCoLC)51316821  |z (OCoLC)52347003  |z (OCoLC)1022734731 
040 |a DLC  |b eng  |c DLC  |d NLGGC  |d BAKER  |d BTCTA  |d LVB  |d YDXCP  |d IG#  |d UBA  |d UKM  |d CNCGM  |d BDX  |d SYB  |d OCLCF  |d DEBSZ  |d I8M  |d OCLCQ 
042 |a pcc 
050 0 0 |a TS156  |b .B75 2003 
082 |a 658.562 BRE 
100 1 |a Breyfogle, Forrest W.,  |d 1946- 
245 1 0 |a Implementing six sigma :  |b smarter solutions using statistical methods /  |c Forrest W. Breyfogle, III. 
250 |a 2nd ed. 
260 |a Hoboken, NJ :  |b Wiley,  |c 2003. 
300 |a xlii, 1187 p. :  |b illustrations ;  |c 25 cm. 
504 |a Includes bibliographical references (pages 1125-1138) and index. 
505 0 |a pt. I. S[superscript 4]/IEE Deployment and Define Phase from DMAIC -- 1. Six Sigma Overview and S[superscript 4]/IEE Implementation -- 2. Voice of the Customer and the S[superscript 4]/IEE Define Phase -- pt. II. S[superscript 4]/IEE Measure Phase from DMAIC -- 3. Measurements and the S[superscript 4]/IEE Measure Phase -- 4. Process Flowcharting/Process Mapping -- 5. Basic Tools -- 6. Probability -- 7. Overview of Distributions and Statistical Processes -- 8. Probability and Hazard Plotting -- 9. Six Sigma Measurements -- 10. Basic Control Charts -- 11. Process Capability and Process Performance Metrics -- 12. Measurement Systems Analysis -- 13. Cause-and-Effect Matrix and Quality Function Deployment -- 14. FMEA -- pt. III. S[superscript 4]/IEE Analyze Phase from DMAIC (or Passive Analysis Phase) -- 15. Visualization of Data -- 16. Confidence Intervals and Hypothesis Tests -- 17. Inferences: Continuous Response -- 18. Inferences: Attribute (Pass/Fail) Response -- 19. Comparison Tests: Continuous Response -- 20. Comparison Tests: Attribute (Pass/Fail) Response -- 21. Bootstrapping -- 22. Variance Components -- 23. Correlation and Simple Linear Regression -- 24. Single-Factor (One-Way) Analysis of Variance (ANOVA) and Analysis of Means (ANOM) -- 25. Two-Factor (Two-Way) Analysis of Variance -- 26. Multiple Regression, Logistic Regression, and Indicator Variables -- pt. IV. S[superscript 4]/IEE Improve Phase from DMAIC (or Proactive Testing Phase) -- 27. Benefiting from Design of Experiments (DOE) -- 28. Understanding the Creation of Full and Fractional Factorial 2[superscript k] DOEs -- 29. Planning 2[superscript k] DOEs -- 30. Design and Analysis of 2[superscript k] DOEs -- 31. Other DOE Considerations -- 32. Robust DOE -- 33. Response Surface Methodology -- pt. V. S[superscript 4]/IEE Control Phase from DMAIC and Application Examples -- 34. Short-Run and Target Control Charts -- 35. Control Charting Alternatives -- 36. Exponentially Weighted Moving Average (EWMA) and Engineering Process Control (EPC) -- 37. Pre-control Charts -- 38. Control Plan, Poka-yoke, Realistic Tolerancing, and Project Completion -- 39. Reliability Testing/Assessment: Overview -- 40. Reliability Testing/Assessment: Repairable System -- 41. Reliability Testing/Assessment: Nonrepairable Devices -- 42. Pass/Fail Functional Testing -- 43. S[superscript 4]/IEE Application Examples -- pt. VI. S[superscript 4]/IEE Lean and Theory of Constraints -- 44. Lean and Its Integration with S[superscript 4]/IEE -- 45. Integration of Theory of Constraints (TOC) in S[superscript 4]/IEE -- pt. VII. DFSS and 21-Step Integration of the Tools -- 46. Manufacturing Applications and a 21-Step Integration of the Tools -- 47. Service/Transactional Applications and a 21-Step Integration of the Tools -- 48. DFSS Overview and Tools -- 49. Product DFSS -- 50. Process DFSS -- pt. VIII. Management of Infrastructure and Team Execution -- 51. Change Management -- 52. Project Management and Financial Analysis -- 53. Team Effectiveness -- 54. Creativity -- 55. Alignment of Management Initiatives and Strategies with S[superscript 4]/IEE -- App. A. Supplemental Information -- App. B. Equations for the Distributions -- App. C. Mathematical Relationships -- App. D. DOE Supplement. 
520 |a * Includes new and expanded coverage of Six Sigma infrastructure building and benchmarking. * Provides plans, checklists, metrics, and pitfalls. 
650 0 |a Quality control  |x Statistical methods. 
650 4 |a Έλεγχος ποιότητας  |x Στατιστικές μέθοδοι. 
650 0 |a Production management  |x Statistical methods. 
650 7 |a Production management  |x Statistical methods  |2 fast 
650 7 |a Quality control  |x Statistical methods  |2 fast 
776 0 8 |i Online version:  |a Breyfogle, Forrest W., 1946-  |t Implementing six sigma.  |b 2nd ed.  |d Hoboken, NJ : Wiley, 2003  |w (OCoLC)647556095 
852 |a INST  |b UNIPILB  |c MAIN  |e 20210723  |h 658.562 BRE  |p 00183183  |q 00183183  |t LOAN  |y 0  |4 1 
960 |a GEORGE 
960 |a ΜΑΡΙΑ ΒΕΛ